Bridge relocation
From:
John Finn
Date:
Jun 25 01:15 UTC
Short link
Winona's Comprehensive Plan update process touched on the likelihood that
the bridge would be replaced during the time period that the Plan addressed.
It was determined that it was too much of a "wild card" for the Plan to
attempt to address the details of how and where.
One participant in the process was familiar with MnDOT and traffic planning.
I believe she had been involved in Winona's attempt to improve the Hwy 61
corridor through town. Although she wanted to develop a design concept for
inclusion in final document, the Plan ended up saying only, in effect, that
it would be a big deal for our downtown.
I note that she is on the WOD list of members, so I'm concerned that we
haven't heard from her on this subject.
.